Section 102 existing sewer adoption
See also: Section 102 of the Town and Country Planning Act 1990 enabling a notice to be issued ordering the discontinuing use, or alteration or removal of buildings or works.
Section 104 of the Water Industry Act 1991 provides a mechanism for newly-constructed private sewers and pumping stations to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
However, sometimes sewers are not adopted when they are constructed. The most common reasons for this are that they have not been constructed to the required standards or that they are in inaccessible locations.
Section 102 of the Water Industry Act, allows the owners of existing private sewers and associated apparatus to apply for them to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
Authorities may consider adopting private sewers if they are of a suitable construction, they form part of the general sewerage system for the area and they are accessible.
The applicant must first submit general information about the sewer to the authority, who will consider whether it may be appropriate for adoption. Further information is then submitted about the condition of the sewer, and it may then be necessary to carry out remedial works to bring it up to an adoptable standard, as set out in ‘Sewers for Adoption – a Design and Construction Guide for Developers’. An application fee is payable and any direct or associated costs must be met by the applicant.
There is then a statutory 2 month period for objection to the adoption, after which, the sewer may be adopted as a public sewer.
[edit] Related articles on Designing Buildings Wiki
- Drainage.
- French drain.
- Groundwater control in urban areas.
- Highway drainage.
- Planning for floods.
- Private sewer.
- Public sewer.
- Rainwater harvesting.
- Safe working in drains and sewers.
- Section 102 (the discontinuing use, or alteration or removal of buildings or works).
- Section 104.
- Septic tank.
- Sewer construction.
- Sewerage.
- Soakaway.
- Soil vent pipe.
- Sustainable urban drainage systems SUDS.
- Water engineering.
- Water transfers and interconnections.
Featured articles and news
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.
Construction contract awards remain buoyant
Infrastructure up but residential struggles.
Warm Homes Plan and existing energy bill support policies
Breaking down what existing policies are and what they do.
A dynamic brand built for impact stitched into BSRIA’s building fabric.