See also: Section 102 of the Town and Country Planning Act 1990 enabling a notice to be issued ordering the discontinuing use, or alteration or removal of buildings or works.
Section 104 of the Water Industry Act 1991 provides a mechanism for newly-constructed private sewers and pumping stations to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
However, sometimes sewers are not adopted when they are constructed. The most common reasons for this are that they have not been constructed to the required standards or that they are in inaccessible locations.
Section 102 of the Water Industry Act, allows the owners of existing private sewers and associated apparatus to apply for them to be ‘adopted’ by the local sewerage authority, who will then maintain them at their own expense.
Authorities may consider adopting private sewers if they are of a suitable construction, they form part of the general sewerage system for the area and they are accessible.
The applicant must first submit general information about the sewer to the authority, who will consider whether it may be appropriate for adoption. Further information is then submitted about the condition of the sewer, and it may then be necessary to carry out remedial works to bring it up to an adoptable standard, as set out in ‘Sewers for Adoption – a Design and Construction Guide for Developers’. An application fee is payable and any direct or associated costs must be met by the applicant.
There is then a statutory 2 month period for objection to the adoption, after which, the sewer may be adopted as a public sewer.
[edit] Related articles on Designing Buildings Wiki
- Drainage.
- French drain.
- Groundwater control in urban areas.
- Highway drainage.
- Planning for floods.
- Private sewer.
- Public sewer.
- Rainwater harvesting.
- Safe working in drains and sewers.
- Section 102 (the discontinuing use, or alteration or removal of buildings or works).
- Section 104.
- Septic tank.
- Sewer construction.
- Sewerage.
- Soakaway.
- Soil vent pipe.
- Sustainable urban drainage systems SUDS.
- Water engineering.
- Water transfers and interconnections.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February